Marsh expands US$2.7bn data centre construction insurance facility to Asia
July 20 2026 by Roshan Nambiar-
APAC nat cat insured losses reach US$3bn on typhoon, floods damage: Aon
- October 29
Seasonal flooding in China, Typhoon Sinlaku in the Northern Mariana Islands and the Victoria bushfires in Australia were the costliest events.
-
Lockton expands in New Zealand with Wellington office, Marsh and WTW hires
- October 28
Broker appoints Felix Ukaegbu as general manager of the new office and James Earwaker as client director for financial lines.
-
Greg Solomon rejoins WTW as Hong Kong ICT market leader
- October 26
He returns following a previous stint as head of life and health reinsurance in Hong Kong from 2014 to 2019.
-
Alternative solutions go mainstream as energy transition reshapes insurance risk
- October 26
Parametric design, basis risk, uninsured supply chains and the limits of catastrophe models were at the heart of the agenda at InsuranceAsia News' 2026 APAC Climate Risk & Insurance Summit in Singapore.
-
BlackRock | Rethink the rules: how TAA and ETFs are reshaping portfolio construction
BlackRock's Daniel Caderas and MSCI's Raman Aylur Subramanian explain why tactical asset allocation (TAA) and exchange-traded funds (ETF) have become essential as global markets fragment and static allocations lose their reliability.
-
BlackRock | Infrastructure comes of age for insurers
Are insurers capturing full value from the asset class? BlackRock shares its perspective.
-
Beazley | Navigating geopolitical risks at sea
Maritime shipping faces growing geopolitical threats — missiles, drones, GPS interference, and cyber sabotage — requiring better intelligence, crew welfare, and resilience measures.
-
Zurich | Why resilience will define the winners of Asia’s clean energy transition
Planning for future conditions from the outset can improve operational reliability, reduce potential disruption and protect long-term asset value.